Payment Terms in Jewelry Manufacturing
Quick answer: Jewelry manufacturing payment terms are usually built on two moments: a deposit that funds metal and stones before the bench starts, and a balance that falls due once the goods are finished and inspected. Milestone payments on long runs, mould charges, plating and freight are variations on that spine. The deposit exists because a factory has to buy material that is specific to your order and cannot easily be resold. The balance exists because no buyer should pay in full for goods they have not seen.

Most disputes over payment terms are not really about money. They are about timing — who is exposed, for how long, and to what. A schedule that looks expensive is often safer than a cheap one, because it puts the exposure where it can be managed.
Why the schedule follows the metal, not the labour
Labour is paid weekly whether or not your order exists. Metal and stones are bought against a specific job. That asymmetry explains almost every convention in the trade: the deposit tracks the raw material content of the order, not the total invoice.
A silver order set with cubic zirconia has very little material locked up, so a small deposit is normal. A gold order set with certified lab-grown diamonds is the opposite: the factory is buying stones to your specification, in your sizes, and cannot put them back on the shelf. Expectations should scale accordingly. A supplier quoting the same terms on both is either not thinking about it or is pricing the risk back into the unit cost.
The deposit: what it is actually paying for
Ask what the deposit covers and you will learn a great deal about the supplier. A good answer names metal weight, stone parcel, and any tooling. A vague answer — "it secures the order" — is a warning.
Deposits in the trade are typically structured so that the supplier is not financing your inventory, and so that a cancelled order leaves them roughly whole on material. That is a fair principle in both directions. It also means the deposit should be adjustable: if your order is silver with no stones, the material exposure is small and the deposit should reflect that rather than matching a template.
The balance: before shipment, or after inspection
This is the line buyers push hardest, and it is worth understanding what the factory is actually protecting. Once goods leave the building, the supplier's leverage is gone. Once money leaves the buyer's account, the buyer's leverage is gone. Both sides know it.
Common structures include balance before dispatch, balance against a copy of the shipping documents, or balance on arrival for established accounts. Each shifts risk by a few days. For a first order, expect the supplier to want the balance before the goods move, and expect to want it after you have seen them. A photography or inspection step before the balance is a reasonable middle: you see the actual pieces, they keep the goods until payment clears.
Milestones on larger runs
Long production schedules are often split into three or four payments tied to stages rather than dates: on order, on casting or component completion, before dispatch, and sometimes a retention held briefly after arrival. The point of a milestone is that it should be verifiable. "Thirty per cent on start of production" is not verifiable. "Thirty per cent when the moulds are cut and the first shots are approved" is.
Buyers who ask for photographic evidence at each milestone — mould, first cast, pre-polish, packed carton — get most of the protection of an inspection visit at almost no cost.
What sits outside the terms, and should not
Three costs regularly fall through the gap between quotation and invoice: tooling, plating and freight. Moulds and dies are a one-time capital cost that belongs to someone. If the buyer pays for it, the buyer should own it, and should be able to ask for it or have it held. If the supplier pays, it is amortised into unit price and the buyer should not be surprised by a lower price on a repeat order.
Plating is the most common omission. Rhodium over white gold, gold plating over silver and any e-coating are separate processes with separate failure modes, frequently quoted as "included" in a way that means one micron. Freight and duty are usually the buyer's; handling and export documentation sometimes are not, and that difference shows up at the port rather than on the quotation.
Who carries which risk
A well-drawn schedule puts each risk where it can be managed. Material price risk sits with whoever holds the metal, which is why some suppliers quote a metal base and adjust — and why adjustments should reference a published price and a date, not a phone call.
Quality risk sits with the supplier until approval, which is why the inspection step matters more than the payment percentage. Transit risk sits with whoever holds the insurance — a named party on the documents, not an assumption.
What jewelry manufacturing payment terms should spell out
Not a long contract. Five lines will do: the deposit and what it covers, the trigger for the balance, who owns tooling, what happens on cancellation at each stage, and which party pays which freight term. Add the exchange-rate reference if the invoice is not in your currency.
Cancellation is the clause buyers skip and later wish they had read. A schedule that says "deposit non-refundable" is incomplete. The useful question is what happens at each stage — before material purchase, after casting, after setting. Cost should be recoverable and proportional.
Signs a schedule is being used to fund someone else
A supplier asking for most of the value before any material is bought is using your order as working capital. That is not automatically disqualifying — small workshops genuinely run tight — but it changes what you ask for: a shorter production window, more progress photographs, and a written right to inspect before the final payment.
The reverse problem exists too. A supplier who asks for nothing up front has no cost of delay, and a buyer with no deposit has no queue position. Some commitment in both directions is what keeps a schedule honest.

FAQ
What deposit is normal for a first jewelry order?
It varies with material content rather than order size. Silver with no stones needs less up front than gold carrying certified stones, because the resale risk on the material differs. Ask what the deposit covers before comparing suppliers.
Should I pay the balance before or after inspection?
After you have seen the goods, whether by third-party inspection or detailed pre-dispatch photographs. Many suppliers will hold finished goods pending payment and release on confirmation.
Is a letter of credit used in jewelry manufacturing?
For large orders and new counterparties, yes, though the cost and paperwork make it uncommon on smaller runs. A documentary collection is a lighter middle ground that still gives the buyer a checkpoint.
Who pays for the moulds?
Either side can, but the arrangement should be explicit. If you pay, ask for ownership and retention of the tooling for repeat orders. If the supplier pays, expect the cost inside the unit price.
Are jewelry manufacturing payment terms negotiable?
Yes, and they usually are — but what moves is timing, not the total. Trade the schedule against commitment: volume, a longer forecast, or a firmer delivery window.
Our terms are set per order, because a silver chain run and a gold order carrying certified stones are not the same exposure. Send a specification to sales@holycome.com to see how a schedule would look, or start from our custom jewelry services page.
If you are sourcing this for a production run, send your spec through our custom jewelry services page or write to sales@holycome.com">sales@holycome.com. We answer Monday to Saturday, 09:00–18:00 GMT+8.